The activities for the batch 2 companies began with the initial assessment which was scheduled between the end of August to the mid of September 2010.
The 1st workshop for the batch 1 was held at the German European School, Manila on the 26th of August 2010. The workshop was on Cleaner production. The workshop included any hands-on activities to make the participant realize the importance of cleaner production and held them analyze the solutions for the common problems faced in the normal end of pipe approach.
Original post from GPIos/Ecoswitch-ph
Posted on September 15, 2010 in Ecoswitch Updates by Jill Padua